Special Steel Structures | Project Case Study

2026-10-20
Latest company cases about Special Steel Structures | Project Case Study

Special Steel Structures | Project Case Study

Project Basic Information

Project Country: United Arab Emirates Building Area: 12,600 m² Total Steel Consumption: 1680 tons Structure Type: Heavy steel frame with multi-bay rigid composite frame, large-span heavy load industrial workshop Delivery Cycle: 14 weeks from drawing confirmation to all components shipped Applicable Standards: AISC, EN1090, CSA

Client Pain Points

The client is a local overseas engineering contractor. The original challenges include long-span heavy load requirements for production cranes, severe salt spray corrosion in coastal areas, strict local building code compliance, tight construction schedule, and complicated drawing coordination and shop drawing detailing. The client’s previous suppliers failed to deliver integrated BIM coordination and full set of fabrication drawings, which brought risks of on-site rework and project delay.

Customized Solution

We delivered full one-stop heavy steel engineering service. BIM modeling was adopted in the whole design phase for clash detection and structural optimization. Q460 high-strength heavy steel was selected for main frames to realize large clear span and heavy load capacity. Components were fabricated on fully automatic production lines. Our engineering team completed full set of shop drawing detailing, calculation documents and compliance verification. We also provide remote and on-site overseas erection guidance to assist local construction teams.

Production & Delivery Footage

Numerically controlled cutting, automatic submerged arc welding, shot blasting and anti-corrosion coating processing photos and short videos. Loading and sea shipment footage for containerized steel components.

Final Project Result

Completed building aerial panoramic view, internal heavy overhead crane running test, facade and joint detail close-up photos. The workshop meets daily heavy industrial production operation, stable under coastal wind and seismic load.

Cooperation Value Summary

Optimized steel consumption cuts overall project cost. Prefabricated manufacturing greatly shortens site construction time. The whole structure fully complies with local safety and energy codes. Advanced multi-layer anti-corrosion coating system provides 30-year corrosion protection.

Client Testimonial

“We are impressed by their integrated heavy steel capacity. The BIM drawings and detailed fabrication documents saved us huge communication cost. The Q460 heavy steel members meet AISC and EN1090 requirements perfectly. Their production quality control and erection guidance helped us finish this tight-schedule coastal factory without major defects. We will continue long-term cooperation for our upcoming industrial projects.”